Taxation Ruling

TR 2011/2

Income tax: effective life of depreciating assets (applicable from 1 July 2011)

This version is no longer current. Please follow this link to view the current version.

  • Please note that the PDF version is the authorised version of this ruling.
    This document has changed over time. View its history.

Effective lives (Industry Categories)
Table A as at 1 July 2011 - ELECTRICITY, GAS, WATER AND WASTE SERVICES

ELECTRICITY, GAS, WATER AND WASTE SERVICES
( 26110 to 29220 )
 
Electricity supply
( 26110 to 26400 )
ASSET LIFE
(YEARS)
REVIEWED DATE OF
APPLICATION
Electricity distribution:      
        Control, monitoring, communications and protection systems 10   *   1   Jan   2002
        Customer meters (incorporating load and time switches if fitted) 25   *   1   Jan   2002
        Customer service mains or cable, above ground 40   *   1   Jan   2002
        Customer service mains or cable, underground 50   *   1   Jan   2002
        Distribution lines:      
                Above ground (incorporating conductors; cross arms, insulators and fittings; poles concrete, wood, steel or stobie; and transformers pole or ground pad mounted) 45   *   1   Jan   2002
                Combination of above ground and underground 47   ½   *   1   Jan   2002
                Underground (incorporating cables, fittings and ground pad mounted transformers) 50   *   1   Jan   2002
        Distribution substations/transformers, pole or ground pad mounted 40   *   1   Jan   2002
        Distribution zone substations (excluding control, monitoring, communications and protection systems) 40   *   1   Jan   2002
        Nightwatchman's lights 15   *   1   Jan   2002
        Street lights 15   *   1   Jan   2002
Electricity generation:      
        Ash and dust handling and disposal:      
                Ash dams 20   *   1   Jan   2002
                Ash slurry system 15   *   1   Jan   2002
                Conveyors 30   *   1   Jan   2002
                Crushers 15   *   1   Jan   2002
                On-site storage silos, concrete or steel 30   *   1   Jan   2002
        Fuel supply and handling:      
                On-site gaseous fuel supply system (incorporating downstream delivery pipelines) 30   *   1   Jan   2002
                On-site liquid fuel supply system (incorporating ownstream delivery pipelines) 30   *   1   Jan   2002
                Solid fuels:      
                        Coal handling assets (including conveyors, slot bunker, transfer towers, and weighers) 30   *   1   Jan   2002
                        Day bunkers and silos, concrete or steel (incorporating top side conveyor system) 30   *   1   Jan   2002
                        On-site coal storage assets (including stacking and reclaiming assets) 30   *   1   Jan   2002
                        On-site storage silos, concrete or steel 30   *   1   Jan   2002
                        Quality control assets (including coal sampling assets and secondary crushers) 30   *   1   Jan   2002
        Power generators:      
                Co-generation:      
                        Condensing and feed heating assets 30   *   1   Jan   2002
                        Control and monitoring system 15   *   1   Jan   2002
                        Emergency power supply assets (including batteries and uninterruptible power supply assets) 15   *   1   Jan   2002
                        Gas turbine generators 30   *   1   Jan   2002
                        Generator transformer and unit transformer in sub-tropical area 30   *   1   Jan   2002
                        Generator transformer and unit transformer in tropical area 25   *   1   Jan   2002
                        Heat recovery steam generator 30   *   1   Jan   2002
                        Miscellaneous assets 30   *   1   Jan   2002
                        On-site switchyard with conventional outdoor switchgear 30   *   1   Jan   2002
                        On-site switchyard with gas insulated switchgear 30   *   1   Jan   2002
                        Reciprocating engine, diesel fired 20   *   1   Jan   2002
                        Reciprocating engine, gas spark ignition 20   *   1   Jan   2002
                        Station and auxiliary electrical systems within the power station 30   *   1   Jan   2002
                        Steam turbine generator 30   *   1   Jan   2002
                Combined cycle:     *   1   Jan   2002
                        Condensing and feed heating assets 30   *   1   Jan   2002
                        Control and monitoring system 15   *   1   Jan   2002
                        Emergency power supply assets (including batteries and uninterruptible power supply assets) 15   *   1   Jan   2002
                        Gas turbine generators 30    
                        Generator transformer and unit transformer in sub-tropical area 30   *   1   Jan   2002
                        Generator transformer and unit transformer in tropical area 25   *   1   Jan   2002
                        Heat recovery steam generator 30   *   1   Jan   2002
                        Miscellaneous assets 30   *   1   Jan   2002
                        On-site switchyard with conventional outdoor switchgear 30   *   1   Jan   2002
                        On-site switchyard with gas insulated switchgear 30   *   1   Jan   2002
                        Station and auxiliary electrical systems within the power station 30   *   1   Jan   2002
                        Steam turbine generator 30   *   1   Jan   2002
                Diesel or gas engine:      
                        Control and monitoring system 15   *   1   Jan   2002
                        Diesel reciprocating engine 20   *   1   Jan   2002
                        Emergency power supply assets (including batteries and uninterruptible power supply assets) 15   *   1   Jan   2002
                        Gas spark ignition reciprocating engine 20   *   1   Jan   2002
                        Generator transformer and unit transformer in sub-tropical area 30   *   1   Jan   2002
                        Generator transformer and unit transformer in tropical area 25   *   1   Jan   2002
                        Miscellaneous assets 30   *   1   Jan   2002
                        On-site switchyard with conventional outdoor switchgear 30   *   1   Jan   2002
                        On-site switchyard with gas insulated switchgear 30   *   1   Jan   2002
                        Station and auxiliary electrical systems within the power station 30   *   1   Jan   2002
                Gas turbine:      
                        Control and monitoring system 15   *   1   Jan   2002
                        Emergency power supply assets (including batteries and uninterruptible power supply assets) 15   *   1   Jan   2002
                        Gas turbine generators 30   *   1   Jan   2002
                        Generator transformer and unit transformer in sub-tropical area 30   *   1   Jan   2002
                        Generator transformer and unit transformer in tropical area 25   *   1   Jan   2002
                        Miscellaneous assets 30   *   1   Jan   2002
                        On-site switchyard with conventional outdoor switchgear 30   *   1   Jan   2002
                        On-site switchyard with gas insulated switchgear 30   *   1   Jan   2002
                        Station and auxiliary electrical systems within the power station 30   *   1   Jan   2002
                Hydro-electric:      
                        Control and monitoring system 15   *   1   Jan   2002
                        Emergency power supply assets (including batteries and uninterruptible power supply assets) 15   *   1   Jan   2002
                        Generator transformer and unit transformer in sub-tropical area 30   *   1   Jan   2002
                        Generator transformer and unit transformer in tropical area 25   *   1   Jan   2002
                        Hydro turbines and generators 40   *   1   Jan   2002
                        Miscellaneous assets 40   *   1   Jan   2002
                        On-site switchyard with conventional outdoor switchgear 40   *   1   Jan   2002
                        On-site switchyard with gas insulated switchgear 35   *   1   Jan   2002
                        Station and auxiliary electrical systems within the power station 40   *   1   Jan   2002
                Solar:
                        Photovoltaic electricity generating system assets (incorporating photovoltaic panels, mounting frames and inverters) 20   *   1   Jul   2011
                Thermal:      
                        Condensing and feed heating assets 30   *   1   Jan   2002
                        Control and monitoring system 15   *   1   Jan   2002
                        Emergency power supply assets (including batteries and uninterruptible power supply assets) 15   *   1   Jan   2002
                        Generator transformer and unit transformer in sub-tropical area 30   *   1   Jan   2002
                        Generator transformer and unit transformer in tropical area 25   *   1   Jan   2002
                        Miscellaneous assets 30   *   1   Jan   2002
                        On-site switchyard with conventional outdoor switchgear 30   *   1   Jan   2002
                        On-site switchyard with gas insulated switchgear 30   *   1   Jan   2002
                        Primary dust collection system (incorporating electrostatic precipitators or baghouse filters) 30   *   1   Jan   2002
                        Solid fuel preparation assets (including fuel feeders and milling assets) 30   *   1   Jan   2002
                        Station and auxiliary electrical systems within the power station 30   *   1   Jan   2002
                        Steam generator 30   *   1   Jan   2002
                        Steam turbine generator 30   *   1   Jan   2002
                Wind:      
                        Generator transformer and unit transformer in sub-tropical area 30   *   1   Jan   2002
                        Generator transformer and unit transformer in tropical area 25   *   1   Jan   2002
                        Wind turbine 20   *   1   Jan   2002
        Power station civil and structural works:      
                Chimney stack:      
                        Concrete surround 30   *   1   Jan   2002
                        Steel flues 20   *   1   Jan   2002
                Cooling tower, concrete or timber 30   *   1   Jan   2002
                Cooling water system (excluding cooling towers and condensing assets) 30   *   1   Jan   2002
                Power station buildings, to the extent that they form an integral part of plant 30   *   1   Jan   2002
        Workshop machinery and tools 20   *   1   Jan   2002
Electricity transmission:      
        Control, monitoring, communications and protection systems 12   ½   *   1   Jan   2002
        Power transformers 40   *   1   Jan   2002
        Transmission lines (incorporating conductors, insulators and towers) 47   ½   *   1   Jan   2002
        Transmission substations (excluding power transformers and control, monitoring, communications and protection systems) 40   *   1   Jan   2002
 
Gas supply
( 27000 )
ASSET LIFE
(YEARS)
REVIEWED DATE OF
APPLICATION
Gas distribution:      
        Control systems (excluding computers) 10   *   1   Jul   2002
        Gas meter 15   *   1   Jul   2002
        Low pressure (LP) gas storage holder 40   *#   1   Jul   2002
        Pigging device 5   *   1   Jul   2002
        Pipeline (including high, medium or low pressure trunk, primary or secondary mains or services):      
                Generally 50   *#   1   Jul   2002
                PVC pipeline 30   *#   1   Jul   2002
        Regulators (including gate stations, subgate stations, block valve stations, pressure regulating stations and district regulating stations) 40   *#   1   Jul   2002
Gas transmission:      
        Compressor gas turbine (GT) driver 20   *   1   Jul   2002
        Compressor station assets 30   *#   1   Jul   2002
        Control systems (excluding computers) 10   *   1   Jul   2002
        Gas meter 15   *   1   Jul   2002
        Gas pipeline LNG station assets 30   *#   1   Jul   2002
        Pigging device 5   *   1   Jul   2002
        Pipeline - transmission, spur or lateral 50   *#   1   Jul   2002
        Regulators (including gate stations, subgate stations, block valve stations, pressure regulating stations and district regulating stations) 40   *#   1   Jul   2002
        Underground gas storage asset 40   *#   1   Jul   2002
 
Irrigation water providers
( 28110 )
ASSET LIFE
(YEARS)
REVIEWED DATE OF
APPLICATION
Channel regulators 80   *   1   Jan   2005
Cranes (including gantries) 40   *   1   Jan   2005
Dams and weirs (incorporating gates and actuators) consisting of a barrier to obstruct the flow of water constructed from any or all of the following: concrete, earth and rockfill) 100   *   1   Jan   2005
Drain inlet 50   *   1   Jan   2005
Drainage channels (measured from the point of intersection with another drainage channel to the following intersection) 100   *   1   Jan   2005
Escapes 50   *   1   Jan   2005
Flow meters 20   *   1   Jan   2005
Irrigation channels (incorporating siphons and subways) measured from offtake or regulator to regulator:      
        Concrete 50   *   1   Jan   2005
        Earth 80   *   1   Jan   2005
Measurement flumes 50   *   1   Jan   2005
Metered outlets:      
        Electronic 40   *   1   Jan   2005
        Mechanical 50   *   1   Jan   2005
        Piped 40   *   1   Jan   2005
Offtakes 80   *   1   Jan   2005
Pipes: measured from valve to valve, that are of the same age and same material (not being in the nature of a repair) 80   *   1   Jan   2005
Pump inlets 50   *   1   Jan   2005
Pump sets (incorporating switchboards, starters, motors and pumps) 40   *   1   Jan   2005
Reservoirs and tanks 80   *   1   Jan   2005
Valves 40   *   1   Jan   2005
 
Water supply
( 28110 )
ASSET LIFE
(YEARS)
REVIEWED DATE OF
APPLICATION
Aerators and blowers 20   *   1   Jan   2005
Cathodic protection systems 20   *   1   Jan   2005
Chemical dosing pumps 25   *   1   Jan   2005
Pump sets (incorporating switch boards, starters, motors and pumps) 25   *   1   Jan   2005
Pressure reducing valves 25   *   1   Jan   2005
Valves (excluding pressure reducing valves) 30   *   1   Jan   2005
Raw water storage and supply assets:      
        Bores 30   *   1   Jan   2005
        Dams and weirs 100   *   1   Jan   2005
        Dam or weir intake structures 100   *   1   Jan   2005
Water treatment assets:      
        Balance tanks 80   *   1   Jan   2005
        Bore water treatment assets:      
                Aerators and blowers 20   *   1   Jan   2005
                Lime silos 50   *   1   Jan   2005
                Batching tanks 80   *   1   Jan   2005
                Lime pump sets (incorporating switch boards, starters, motors and pumps) 25   *   1   Jan   2005
                Reactors 25   *   1   Jan   2005
                Filtration tanks 80   *   1   Jan   2005
                Backwash pumps 25   *   1   Jan   2005
                Clear water tanks 80   *   1   Jan   2005
                Sludge thickeners 50   *   1   Jan   2005
                Drying beds 50   *   1   Jan   2005
        Chemical blowers 15   *   1   Jan   2005
        Chemical dosing systems 15   *   1   Jan   2005
        Chemical feeders and hoppers 25   *   1   Jan   2005
        Chemical mixers and blenders 25   *   1   Jan   2005
        Chemical storage tanks 30   *   1   Jan   2005
        Clarifiers (incorporating scrapers) 80   *   1   Jan   2005
        Clear water tanks 80   *   1   Jan   2005
        Dissolved air flotation systems 25   *   1   Jan   2005
        Filtration tanks (incorporating scrapers) 80   *   1   Jan   2005
        Flocculation tanks (incorporating scrapers) 80   *   1   Jan   2005
        Inline mixers 15   *   1   Jan   2005
        Pen-stops 25   *   1   Jan   2005
        Raw water inlet screening systems 25   *   1   Jan   2005
        Sludge treatment lagoons 50   *   1   Jan   2005
        Wash water holding tanks 80   *   1   Jan   2005
Water mains: Being lengths of trunk, distribution and reticulation mains within a section, measured from valve to valve that are of the same age and same material (not being in the nature of a repair) 80   *   1   Jan   2005
Water supply pumping station detention tanks 80   *   1   Jan   2005
Reservoirs, elevated tanks and standpipes: whether made from steel or concrete 80   *   1   Jan   2005
Service connections:      
        Water meters 20   *   1   Jan   2005
Water supply control systems assets:      
        Air scour flow meters, level sensors, transmitters and meters 10   *   1   Jan   2005
        Chlorine analysers, mini labs, PH meters, turbidity analysers and meters 7   *   1   Jan   2005
        Flow meters 20   *   1   Jan   2005
        Pressure sensors, transmitters and meters 10   *   1   Jan   2005
        Telemetry (including modems and remote transfer units) 10   *   1   Jan   2005
        Variable speed drives 15   *   1   Jan   2005
 
Sewerage and drainage services
( 28120 )
ASSET LIFE
(YEARS)
REVIEWED DATE OF
APPLICATION
Chemical dosing pumps 25   *   1   Jan   2005
Pump sets (incorporating switch boards, starters, motors and pumps) 25   *   1   Jan   2005
Sewage service connection assets:      
        Low pressure pumps 25   *   1   Jan   2005
        Vacuum pumps 25   *   1   Jan   2005
Sewer mains: Being lengths of collection sewers measured from manhole to manhole (including branch, main, pressure, reticulation, sub-main and trunk sewers) (not being in the nature of a repair) 80   *   1   Jan   2005
Pressure reducing valves 25   *   1   Jan   2005
Valves (excluding pressure reducing valves) 30   *   1   Jan   2005
Sewage pump station assets:      
        Detention tanks 80   *   1   Jan   2005
        Overflow screens 25   *   1   Jan   2005
Sewage treatment assets:      
        Air filtration systems 20   *   1   Jan   2005
        Air scrubbers 10   *   1   Jan   2005
        Chemical blowers 15   *   1   Jan   2005
        Chemical feeders and hoppers 25   *   1   Jan   2005
        Chemical mixers and blenders 25   *   1   Jan   2005
        Chemical storage tanks 30   *   1   Jan   2005
        Pen-stops 25   *   1   Jan   2005
        Water storage tanks 80   *   1   Jan   2005
        Screenings removal assets 25   *   1   Jan   2005
        Grit removal assets 25   *   1   Jan   2005
        Primary treatment assets:      
                Primary clarifiers (incorporating scrapers) 80   *   1   Jan   2005
                Primary sedimentation lagoons 50   *   1   Jan   2005
                Primary sedimentation tanks (incorporating scrapers and weirs) 80   *   1   Jan   2005
                Scum collection and transfer systems 25   *   1   Jan   2005
        Secondary treatment assets:      
                Biological nutrient removal (BNR) assets:      
                        Aerators and blowers 20   *   1   Jan   2005
                        BNR tanks (incorporating mixed liquor stream, anoxic, anaerobic and swing zones and diffusers) 80   *   1   Jan   2005
                        Mixers 25   *   1   Jan   2005
                Secondary clarifiers (incorporating scrapers) 80   *   1   Jan   2005
                Secondary treatment lagoons 50   *   1   Jan   2005
                Secondary treatment tanks (incorporating scrapers and weirs) 80   *   1   Jan   2005
                Sequenced batch reactors 80   *   1   Jan   2005
                Sludge aerators and blowers 80   *   1   Jan   2005
        Tertiary treatment assets:      
                Backwash air blowers 20   *   1   Jan   2005
                Chlorine contact tanks 80   *   1   Jan   2005
                Filtration tanks 80   *   1   Jan   2005
                Reverse osmosis assets:      
                        Fine screening systems 15   *   1   Jan   2005
                        Micro filtration units 15   *   1   Jan   2005
                        Reverse osmosis membrane filtration units 10   *   1   Jan   2005
                UV disinfectors 25   *   1   Jan   2005
        Sludge processing assets:      
                Anaerobic digesters 80   *   1   Jan   2005
                Anaerobic digester gas handling and blowing systems 25   *   1   Jan   2005
                Anaerobic digester heating systems 25   *   1   Jan   2005
                Bio-filters 80   *   1   Jan   2005
                Dissolved air flotation systems 25   *   1   Jan   2005
                Lime disinfection dosing units 25   *   1   Jan   2005
                Sludge dewatering assets:      
                        Belt presses 15   *   1   Jan   2005
                        Centrifuges 20   *   1   Jan   2005
                        Screw conveyors 25   *   1   Jan   2005
                        Screw presses 20   *   1   Jan   2005
                        Sludge driers 20   *   1   Jan   2005
                Sludge heating units 20   *   1   Jan   2005
                Sludge thickening tanks (incorporating scrapers) 80   *   1   Jan   2005
Methane gas and cogeneration assets (see Electricity supply, 26100 and Gas supply, 27100)      
Dams:      
        Lined earth dams 100   *   1   Jan   2005
        Dam covers 20   *   1   Jan   2005
Effluent outfalls:      
        Shoreline ocean 100   *   1   Jan   2005
        Extended ocean 100   *   1   Jan   2005
        River or estuary 100   *   1   Jan   2005
Sewerage control systems assets:      
        Chlorine residual analysers and PH meters 7   *   1   Jan   2005
        Dissolved oxygen probes, level sensors, transmitters and meters 10   *   1   Jan   2005
        Flow meters 20   *   1   Jan   2005
        Telemetry (including modems and remote transfer units) 10   *   1   Jan   2005
        Variable speed drives 15   *   1   Jan   2005
 
Waste disposal services
( 29110 )
ASSET LIFE
(YEARS)
REVIEWED DATE OF
APPLICATION
Garbage compactor trucks (including the compactor) 10   *   1   Jan   2005
CONSTRUCTION
( 30110 to 32990)
 
ASSET LIFE
(YEARS)
REVIEWED DATE OF
APPLICATION
Air compressors:      
        Compressors - reciprocating 7   *   1   Jul   2008
        Compressors - rotary screw 10   *   1   Jul   2008
Backhoe loaders 9   *   1   Jul   2002
Bending machines (bar, angle or rod) 10   *   1   Jul   2008
Block and brick elevators (portable) 10   *   1   Jul   2008
Chain blocks, rod shears, jacks, etc 13 ⅓   1   Jan   2001
Compaction:      
        Compactors - flat plate 8   *   1   Jul   2008
        Compactors - vertical rammer 6   *   1   Jul   2008
Concreting assets:      
        Brick and paving saws 5   *   1   Jul   2008
        Concrete demolition saws 3   *   1   Jul   2008
        Concrete kibble buckets 15   *   1   Jul   2008
        Concrete mixers 4   *   1   Jul   2008
        Concrete surface preparation assets (including floor grinders, planers and scarifers) 5   *   1   Jul   2008
        Concrete trowels:      
                Walk behind 5   *   1   Jul   2008
                Ride on 7   *   1   Jul   2008
        Concrete vibrating screeders 5   *   1   Jul   2008
        Concrete vibrators:      
                Brushcutter style 5   *   1   Jul   2008
                Drive units 6   *   1   Jul   2008
                Flexible shaft pumps 6   *   1   Jul   2008
                Vibrating shaft 3   *   1   Jul   2008
        Concrete wheeled saws 6   *   1   Jul   2008
Concreting plant:      
        Batching plant:      
                Portable and demountable 6 ⅔   1   Jan   2001
                Static 13 ⅓   1   Jan   2001
        Buggies or dumpers (motorised) 5   1   Jan   2001
        Hoppers, skips and hoist buckets 10   1   Jan   2001
        Mobile concrete pumping units 6 ⅔   1   Jan   2001
Cranes (mobile):      
        Light and medium 15   *   1   Jul   2002
        Heavy (over 15.24 tonnes lift) 20   *   1   Jul   2002
        Tower and hoists 10   1   Jan   2001
Dozers/Front end loaders 9   *   1   Jul   2002
Forklifts 11   *   1   Jul   2002
Formwork, beams and props, steel 10   *   1   Jul   2008
Hydraulic excavators 10   *   1   Jul   2002
Levels:      
        Dumpy 7   *   1   Jul   2008
        Laser beam 10   *   1   Jul   2008
Lift slab assets (incorporating spreader bars, clutches, pulleys and cables) 5   *   1   Jul   2008
Mini excavators 8   *   1   Jul   2002
Motor graders 10   *   1   Jul   2002
Pavers 12   *   1   Jul   2002
Power supply assets:      
        Generators, portable (incorporating attached engine management and generator monitoring instruments):      
                Diesel 10   *   1   Jul   2008
                Petrol 5   *   1   Jul   2008
Power tools:      
        Chain saws 3   *   1   Jul   2008
        Hand tools:      
                Air 5   *   1   Jul   2008
                Battery 3   *   1   Jul   2008
                Electric 5   *   1   Jul   2008
        Jack hammers:      
                Air 7   *   1   Jul   2008
                Electric 3   *   1   Jul   2008
        Nail guns - air 3   *   1   Jul   2008
Profilers 10   *   1   Jul   2002
Pumps 10   1   Jan   2001
Road rollers 15   *   1   Jul   2002
Saws, bench and mitre, portable 7   *   1   Jul   2008
Scrapers 8   *   1   Jul   2002
Skid steer loaders 7   *   1   Jul   2002
Stabiliser recyclers 12   *   1   Jul   2002
Telescopic handlers 10   *   1   Jul   2002
Tool carriers 10   *   1   Jul   2002
Track loaders 9   *   1   Jul   2002
Traffic management assets (use the relevant lives given under Rental and hiring services (66110 to 66310), whether or not the assets are in fact hired or leased)      
Welders:      
        Diesel 10   *   1   Jul   2008
        Electric 5   *   1   Jul   2008
Wheel loaders 8   *   1   Jul   2002
Winches 13 ⅓   1   Jan   2001

Not issued as a draft

References

ATO references:
NO 99/132027; 2000/20567; 2003/11601; 2004/17815;

ISSN: 1039-0731

Related Rulings/Determinations:

IT 2685
TR 2000/18
TR 2006/5
TR 2006/15
TR 2007/3
TR 2008/4
TR 2009/4
TR 2010/2

Subject References:
Commissioner's determination of effective life
Commissioner's effective life schedule
decline in value
depreciating assets
depreciation
depreciation rates
effective life
self assessment of effective life

Legislative References:
ITAA 1997
ITAA 1997 Div 40
ITAA 1997 40-70(1)
ITAA 1997 40-72(1)
ITAA 1997 40-75(1)
ITAA 1997 40-95
ITAA 1997 40-100
ITAA 1997 40-100(4)
ITAA 1997 40-100(4)(b)
ITAA 1997 40-105(1)
ITAA 1997 40-110
ITAA 1997 Subdiv 40-B
ITAA 1997 Subdiv 40-E
ITAA 1997 Subdiv 40-F
ITAA 1997 Subdiv 40-G
ITAA 1997 40-520
ITAA 1997 40-555(1)
ITAA 1997 Subdiv 42-M
ITAA 1997 Div 43
ITAA 1997 Subdiv 328-D
TAA 1953
Tax Laws Amendment (Improvements to Self Assessment) Act (No. 2) 2005

TR 2011/2 history
  Date: Version: Change:
You are here 29 June 2011 Consolidated ruling  

Copyright notice

© Australian Taxation Office for the Commonwealth of Australia

You are free to copy, adapt, modify, transmit and distribute material on this website as you wish (but not in any way that suggests the ATO or the Commonwealth endorses you or any of your services or products).