Energy Grants (Credits) Scheme Regulations 2003
(regulation 13)
Part 3 Variations of the basic calculation methods Division 2 The percentage use method 3.2.5 When you need to work out a new sample percentage (1)For the purpose of the calculation in clause 3.2.2 , you must work out a new sample percentage if your pattern of usage in the current claim period of fuel of a class mentioned in subclause 1.2(2) has substantially changed since the end of the sample period in:
(a) the current claim period; or
(b) an earlier claim period.
(2)
For the purpose of the calculation in clause 3.2.2 in a particular claim period, if:
(a) subclause (3) or (4) does not apply; or
(b) you do not have a current sample percentage;
you must work out a new sample percentage for that claim period.
(3)
For the purpose of the calculation in clause 3.2.2 in a particular claim period, if:
(a) the total of your claims for payment of an energy grant in:
(i) the first 12 months after you first calculated your sample percentage; or
is less than $10 000; and
(ii) any of the periods of 12 months starting on the anniversary of first calculating your sample percentage;
(b) the claim period is within 60 months after you first calculated your sample percentage; and
(c) subclause (1) does not apply;
you may use the sample percentage for that claim period.
(4)
For the purpose of the calculation in clause 3.2.2 in a particular claim period, if:
(a) the total of your claims for payment of an energy grant in the first 12 months after you first calculated your sample percentage is at least $10 000; and
(b) the claim period is within 12 months after you first calculated your sample percentage; and
(c) subclause (1) does not apply;
you may use the sample percentage for that claim period.
This information is provided by CCH Australia Limited Link opens in new window. View the disclaimer and notice of copyright.